Uncategorized

Here, long-time GP foreman, Dustin, fabricates a steel bollard assembly at our shop.  It will be installed at a local ice cream manufacturing facility, where the temperature is -5deg F.  Therefore, welding and painting need to be completed off-site to ensure proper welds and paint curing.  The assembly will protect Read More

Uncategorized

Fresh Express Project

Cold Weather Construction

When temperatures dip well below freezing, like they have here in central Pennsylvania recently, special attention must be given to both manpower and materials. Here, tents have been built around masons’ scaffold, so that heat can be introduced, and concrete block can be laid without fear that Read More