Uncategorized

 This is one of two parts of a condensing unit, which is the major component of a current refrigeration expansion project at a food processing/cold storage facility.  The two together weigh nearly 50,000lbs.

Here, the unit is rigged, and ready to be lifted into place by a 150 ton capacity Read More

Uncategorized

Galbraith Pre-Design, Inc. has just been awarded a design/build contract for an expansion of the Carlisle Regional Medical Center’s cancer center.  The building will house the center’s new state-of-the-art radiation equipment, and will involve detailed structural, radiation vault, and radiation shielding components.  This is cutting edge technology – not surprising, Read More

Uncategorized

Here, long-time GP foreman, Dustin, fabricates a steel bollard assembly at our shop.  It will be installed at a local ice cream manufacturing facility, where the temperature is -5deg F.  Therefore, welding and painting need to be completed off-site to ensure proper welds and paint curing.  The assembly will protect Read More

Uncategorized

Fresh Express Project

Cold Weather Construction

When temperatures dip well below freezing, like they have here in central Pennsylvania recently, special attention must be given to both manpower and materials. Here, tents have been built around masons’ scaffold, so that heat can be introduced, and concrete block can be laid without fear that Read More