Uncategorized

 This is one of two parts of a condensing unit, which is the major component of a current refrigeration expansion project at a food processing/cold storage facility.  The two together weigh nearly 50,000lbs.

Here, the unit is rigged, and ready to be lifted into place by a 150 ton capacity Read More

Uncategorized

Galbraith Pre-Design, Inc. has just been awarded a design/build contract for an expansion of the Carlisle Regional Medical Center’s cancer center.  The building will house the center’s new state-of-the-art radiation equipment, and will involve detailed structural, radiation vault, and radiation shielding components.  This is cutting edge technology – not surprising, Read More

Uncategorized

Here, long-time GP foreman, Dustin, fabricates a steel bollard assembly at our shop.  It will be installed at a local ice cream manufacturing facility, where the temperature is -5deg F.  Therefore, welding and painting need to be completed off-site to ensure proper welds and paint curing.  The assembly will protect Read More