Case Study, General Contracting

A customer has been having issues with him storm water system not functioning properly, due to it degrading over time, plus improper installation originally.

We excavated and removed all rusted-out pipe, as well as unsuitable fill, and replaced with black corrugated plastic pipe and compacted stone fill.  We also adjusted the elevations of concrete catch basins so that the detention pond would drain properly.

When finished, topsoil was spread, fine-graded, stabilized, and seeded..