The Christmas and New Year holidays are an extremely busy time for us. Food processing facilities (if they shut down at all) shut down for a week in order to complete maintenance projects which cannot be completed while in production. We spend months prior to December planning, scheduling, and ordering Read More
Posts Categorized: Case Study
Here we are in Winchester, VA repairing a hydraulic recessed scissors lift which has deteriorated over the past 30+ years. We have installed numerous lifts like this throughout the years, and they are used heavily and subjected to a great amount off wear, tear, and abuse.
We rigged and secured Read More
We are fortunate to work with innovative facilities, who are at the forefront of plant safety. In this case, we installed a series of steel access ladders, stairs and landings on the roof of their large poultry plant. Easier, safe access is not only necessary for day-to-day operations, but is Read More
It is always rewarding visiting completed projects to see how a client is utilizing their building. In this case, we have been revisiting this client for well over 30 years, constructing their facility phase by phase, and generation by generation.
Here, we added 10,000sq ft to their warehouse and Read More
Coming Soon!!! Galbraith/Pre-Design, Inc.’s owners are pleased to be part of the development group for this exciting project. The Concours at Carlisle is a unique concept that affords buyers a once in a lifetime opportunity to own a Luxury Auto Condo right next to Carlisle Events’ world famous Carlisle Fairgrounds! Read More
We recently started our latest food processing project for a pre-packaged salad facility. This project consists of a large amount of concrete demolition, excavation, concrete construction, and insulated metal panels. Strict food safety regulations create challenges to solve problems before they arise.
Our specialized food safety certifications, and vast experience Read More


Rough-in inspections are complete, drywall is hung, exterior finishes are being completed – progress is ongoing at AMVETS Post 274. The members are anxious to take occupancy, and we are looking forward to turning it over to them.
However, there is still work to be done – handicap ramp, paint, Read More
A processing facility called recently, after discovering that one of their process waste pipes was not draining where it should be. This is a facility constructed many decades ago, so finding a path to tie the drain into a new location was going to be extremely challenging.
Being known for Read More
This is another food processing facility ceiling replacement. FRP ceiling tile used to be the standard in process facilities; however, due to their texture, they are at risk of harboring salmonella, listeria, and other dangerous micro-organisms – causing an increased risk of failed inspections at best, and costly recalls or Read More

Wood framing continues at AMVETS Post 274 in Carlisle, PA. Roof framing is being achieved through the use of a combination of engineered wood trusses, as well as conventional lumber, in order to tie the new addition into the existing building.
Some of the challenges being faced include: out-of-square and Read More